Northpower safe, reliable, hassle free service.

Bookmark and Share

Case Studies

In this section:

  • Wairau 33kV Cable Joint Replacement

    This Vector Electricity 33kV oil cable passes beneath a bus terminal forming part of Auckland’s North Shore bus lane. Utilities contractor Siemens needed specialist help when a damaged portion of the cable linking the network to the Wairau Road zone sub-station experienced a loss of oil pressure, threatening the security of supply to the north shore.

  • State Highway 20 Manukau Extension

    The State Highway 20 Manukau Extension is a $210 million construction project for the New Zealand Transport Agency, involving the construction of 4.5 kilometres of a new four-lane motorway to improve access to Auckland International Airport and Manukau City.

  • Huntly Power Station – 220kV Bushing Replacement

    Huntly Power Station is New Zealand’s largest thermal power station, generating up to 20 per cent of the country’s electricity supply. Owned by Genesis Energy, the power station provides electricity to much of the North Island, including Auckland and the Taranaki, Ruapehu and Waikato districts.

  • Vector Electricity - Clendon Zone Substation

    Vector Electricity required a new 33/11kV zone substation to be built in a greenfields site at Clendon, Manukau City, to increase capacity and ease the load on the network.

Did you know?

A 4 kg steel ball will be dropped several times from a height of 15 metres onto the hard hat.  The hard hat is passed if there is no damage.

Terms & Conditions Terms of Use Site Information Sitemap