Plan No.Energised ICP’s at 01/04/2010 Price Plan descriptionApplicable charges excluding meteringTariff CodeAvailability per dayTotal line charge from 1/04/09Total line charge from 1/04/10 Transmission portion of total line charge from 1/04/2010
ND1 9,256 NON DOMESTIC Standard daily charge A   25.00 25.00 cents/ day 0%
    (100A or less) Non-domestic 24 hour 33 24 hours 9.70 10.05 cents/ unit 23%
    Priority controlled 05 22 hours 4.60 5.00 cents/ unit 28%
    Non-domestic 18 hour 46 18 hours 3.50 3.50 cents/ unit 26%
    Non-domestic night rate boosted (Closed tariff) 57 2300-0700
+1200-1500
3.35 3.50 cents/ unit 17%
    Non-domestic night rate 47 2300-0700 0.85 0.90 cents/ unit 22%
    Metered lighting 19 Dusk to dawn 7.50 7.85 cents/ unit 30%
    Unmetered lighting 24 Dusk to dawn 7.50 7.85 cents/ unit 30%
     Exported Generation 93 24 hours       0 cents/ unit 0%
ND2 305 LARGE COMMERCIAL Large Comm daily charge B   105.00 105.00 cents/ day 0%
    (with CT metering) Large Commercial 24 hour 32 24 hours 9.00 9.35 cents/ unit 25%
    Priority controlled rate 05 22 hours 4.60 5.00 cents/ unit 28%
    Non-domestic night rate 47 2300-0700 0.85 0.90 cents/ unit 22%
                 
ND4 42 SCHOOL DAY/NIGHT Standard daily charge S   25.00 25.00 cents/ day 0%
    School day 34 0700-2300 9.70 10.05 cents/ unit 23%
    School night 35 2300-0700 2.50 2.60 cents/ unit 8%
    Priority controlled 55 22 hours 4.60 5.00 cents/ unit 28%
                 
ND5 92 CONTROLLED Standard daily charge P   25.00 25.00 cents/ day 0%
    DAY/NIGHT Controlled day 11 0700-2300* 5.50 5.90 cents/ unit 24%
    Controlled night 12 2300-0700* 2.50 2.60 cents/ unit 8%
    Non-domestic 24 hour 33 24 hours 9.70 10.05 cents/ unit 23%
    Priority controlled 05 22 hours 4.60 5.00 cents/ unit 28%

 

      * Tariff Code 11/12 is subject to control as per Tariff Code 05
ND6 239 UNMETERED 24 HR Daily charge per ICP G   25.00 25.00 cents/ day 0%
    Unmetered  24 hour 25 24 hours 9.70 10.05 cents/ unit 23%

 

               
ND7 21 UNMETERED Daily charge per fitting H   7.00 7.00 cents/ day 0%
    PUBLIC LIGHTING Unmetered lighting 24 Dusk to dawn 7.50 7.85 cents/ unit 30%

 

               
ND11 0 METERED 24 HOUR Standard daily charge A    25.00 25.00 cents/ day 0%
    (CABINETS) Metered 24 hour 43 24 hours  9.70 10.05 cents/ unit 23%

 

               
ND12 357 BUILDERS TEMP BTS daily charge T    50.00 50.00 cents/ day 0%
    BTS 24 hour 53 24 hours  9.70 10.05 cents/ unit 23%

 

               
ND13 N/A LONG TERM D/C Daily charge per ICP L    0.00 0.00 cents/ day 0%

ND4 Price Plan (School Day/Night) is applicable to educational institutions where the winter night load is predominately attributable to night-store heaters with approved control.

Controlled 18-hour and 22-hour line charges apply where Northpower determines the on/off times to manage peak loads. Where other parties determine the control times, line charges will revert to the applicable 24-hour rates.

ICP’s classified as Builders Temporary Supplies (ND12 Price Plan) can not transfer to other Price Plans until the permanent supply has been inspected and signed off by Northpower.

ICP’s with Advanced Metering will remain on the ND1, ND2, ND4, ND5 and ND12 Price Plans provided the retailer (or the data agent) supplies normalised “as-billed” consumption data files to Northpower in EIEP1 format for line charge billing purposes. If half-hour data is provided instead of normalised consumption data, those ICP’s with transfer to price plan ND10 (in Table 3) which is the price-plan for sites with half-hour metering.

ICP’s will be transferred to the Long term De-energised Price plan (ND13) when the meters have been removed and the serviceline has been completely disconnected at the Network Connection Point but permission has not been obtained to permanently dismantle the supply in accordance with Section 62 of the Electricity Act. ICP’s on the ND13 Price Plan can not transfer to other Price Plans until the serviceline meets Northpower’s standard requirements and a CoC for the installation has been sighted by Northpower.