Table 3: Line Charges for Commercial and Industrial sites with half-hour metering on the Northpower network (excluding GST) 
Updated 1st April 2010

Plan No.Applicable charges excluding meteringTariff CodeAvailability per dayTotal line charge from1/04/09 Total line charge from1/04/10  Transmission portion of total line charge from1/04/2010
ND9 (Code 9)Demand-based (66 ICP’s) Monthly Customer charge D 24 hours 113.00 113.00 $/month 0%
  Anytime Demand Charge 09AD   5.20 5.25 $/kVA/month 44%
  Shoulder Demand Charge 09SD   6.80 6.90 $/kVA/month 57%
  Reactive Penalty charge 09RP   2.29 2.41 $/excess kVAr/month 100%
               
ND10
(Code 10)Consumption (70 ICP’s)
Daily Customer charge J 24 hours 244.00 244.00 cents/day 0%
  HH commercial 31   8.70 9.05 cents/unit 26%
  Excess Reactive charge 31RP   3.00 3.00 cents/excess kVArh 100%

Methodology for ND9 “Code 9” charges

  • The Anytime Demand is highest half-hour demand at any time between 1 April and 31 March, with a minimum chargeable demand of 150kVA.
  • The Shoulder Demand is the average of the six highest daily half-hour demands from 0700-1000 and 1700-2130 from May to September with a minimum chargeable demand of 150kVA.
  • Both the Anytime and Shoulder Demand Charges are charged in every month.
  • The Reactive Penalty Charge is assessed on the basis of a 0.95 lagging power factor coincident with the highest half-hour demand each month.

Methodology for ND10 “Code 10” charges

  • The ND10 plan is an alternative for ICP’s with half-hour metering where the ND9 plan is unsuitable.
  • The Excess Reactive Charge is assessed on the basis of an average 0.95 power factor over an entire month.

Note: ND 9 and ND10 are only available at ICP’s with half-hour metering.  Switches to or from ND9 and ND10 can only be made on the first day of a month.

Table 4: Line Charges for Very Large Industrial sites on the Northpower network (excluding GST) 
Updated 1st April 2010

Plan IND
9 ICP’s
Applicable charges Basis of chargeMethodology of allocationCharge from1/04/09 Charge from from1/04/10  
Transmission
  Connection charge The portion of the relevant GXP Connection charge applicable to the ICP. Assets dedicated to the supply are charged 100%. Shared assets are allocated on the basis of the ICP’s demands coinciding with the 12 highest demands at the relevant GXP in the previous year. Assessed per site Assessed per site $/month
  Interconnection charge Rate published by Transpower. Average of the ICP’s demands coinciding with the Regional Peaks (RCPD) in the Capacity Measurement Period (the preceding September-August). $70.94 $69.12 $/kW per annum
  EVA As per Transpower Transpower has factored the EVA into its revenue requirements and no longer distributes a monthly credit Nil Nil
  Reactive capacity charge Rate published by EC for Zone 1 Voltage Support. Reactive requirement at agreed power factor for the average of the 12 highest demands at the ICP in the previous calendar year. $1.52 $1.56 $/kVAr per month
  Reactive Penalty Rate published by EC for Zone 1 Voltage Support. Excess kVAr above Reactive Capacity. Average of six highest daily kVAr demands in the month. $2.29 $2.41 $/excess kVAr per month
  Residual reactive Rate from EC Allocation of deficits or excesses. Rate varies monthly Rate varies monthly
  Electricity Commission levies Rate charged by EC Pass-through of EC levies Rate varies monthly Rate varies monthly $/MWh
Line Charges
  Monthly line charge Return on Northpower assets Assessed per site Assessed per site $/month
  Transmission administration Handling charge Allocated on the basis of the total Connection and Interconnection charges for that month. 2% unless agreed otherwise. 2% unless agreed otherwise. $/month
Loss & Constraint Distribution of credits received. Allocated on the basis of the metered kWh for the ICP in the month to which the credits apply. Rate varies monthly Rate varies monthly cents/kWh